
Number |
Purpose |
PON 3 | Damage to submarine telecommunications cables and plant |
PON 4 | The paper application for consent to drill is now withdrawn. Guidance on drilling consents can be seen here |
PON 5 | The paper application to abandon or temporarily abandon a well is now withdrawn. Guidance on abandonment and suspension consents can be seen here |
PON 6 | Measurement of petroleum |
PON 7 | Reporting of petroleum production |
PON 8 | The paper application to complete and/or workover a well is now withdrawn. Guidance on well completions can be seen here |
PON 9 | Information and sample requirements for offshore surveys and wells under seaward licence terms |
PON 9b | Record and sample requirements for onshore surveys and wells |
PON 12 | Well numbering system |
PON 13 | The paper applications for consent to drill or re-enter HP/HT exploration and appraisal wells are now withdrawn. Guidance on well consents can be seen here |
PON 14b | Notification of intention to carry out onshore landward) geophysical surveys; |
The information previously submitted through PONs 4, 5, 8 and 13 is now submitted through the Energy Portal via the Well Operations Notification System (WONS).
Guidance on the use of the Energy Portal and WONS
Guidance on the legislative requirements for consent to drill and conduct other activities on a well